Migrating from Veracode to Aikido
Teams moving from Veracode to Aikido usually want shorter scan cycles, PR-time gating rather than post-hoc report review, and broader coverage across SAST, SCA, Secrets, IaC, Container, CSPM, and DAST in a single dashboard.
For the overall migration hub, see Migrating to Aikido. For the TCO comparison, see Aikido Total Cost of Ownership vs Legacy SAST.
Why teams switch
-
Dashboard-managed scanning that typically completes in minutes rather than overnight scan cycles.
-
AutoTriage's reachability-first filtering so engineers see net-new, actionable findings on PRs instead of quarterly report dumps.
-
Ownership-aware routing via CODEOWNERS, teams, path-based assignment, and Jira smart routing — findings reach the team that owns the code.
-
One platform for SAST, SCA, Secrets, IaC, Container, CSPM, VM, and DAST instead of a separately-licensed stack.
A safe transition plan
The pattern: visibility first, blocking later, and one tool blocks, the other measures during overlap. Cut over by capability, not by one big-bang date.
-
Pilot on 3–5 representative repositories. Connect Aikido to your SCM and enable the capabilities Veracode currently covers.
-
Baseline existing debt. Aikido distinguishes newly introduced findings from pre-existing ones; historical Veracode debt stays as a non-blocking backlog.
-
Run in parallel, warn-only for the length of your audit cycle (commonly 30–90 days). Veracode remains the blocker; Aikido warns.
-
Validate coverage with your AppSec and compliance reviewers. Confirm languages, repository types, and finding categories match expectations.
-
Set ownership, routing, roles/permissions, and SAML before enforcement. CODEOWNERS, teams, path-based assignment, and Jira smart routing first. No repo onboarded without an owner.
-
Flip enforcement by capability, then move Veracode to report-only.
What to preserve before cutover
-
Veracode scan history and policy reports — keep read-only for your audit retention window. Aikido does not currently publish an automated importer for Veracode findings, mitigations, or policy state.
-
Mitigation/approval records that map to specific compliance controls — keep accessible during overlap.
-
Audit attestations that name Veracode specifically — flag for update at the next audit cycle.
-
Audit evidence going forward comes from Aikido via Reports, PDF and issue export, the activity log API, SBOM/VEX export, the REST API and webhooks, and the Vanta integration for control mapping.
Ownership and routing during migration
Veracode-era workflows often route findings through a central AppSec triage team. Aikido is designed to route findings to code owners directly. Configure CODEOWNERS, teams, path-based assignment, and Jira smart routing before enforcement so the shift from central queue to owner-routing does not surprise developers.
Introducing enforcement without double-blocking PRs
Only one tool blocks a given capability at a time. During overlap, Veracode remains the gate and Aikido warns; after cutover, Aikido is the gate and Veracode moves to report-only or off for that capability.
When to decommission Veracode
Retire by capability once:
-
Aikido has been the sole PR gate for that capability for at least one full release cycle.
-
Net-new finding volume and ownership routing are stable.
-
Required reports and evidence exports have been validated with your audit or compliance reviewer.
-
The Veracode history for that capability is archived read-only.
Most teams align full decommission with the Veracode contract renewal date and an audit cycle boundary.